{"id":4693,"date":"2022-03-04T09:44:59","date_gmt":"2022-03-04T08:44:59","guid":{"rendered":"http:\/\/seipasa.com\/noticias\/seipasa-completes-the-first-phase-of-installing-solar-panels\/"},"modified":"2025-11-04T14:02:09","modified_gmt":"2025-11-04T13:02:09","slug":"seipasa-completes-the-first-phase-of-installing-solar-panels","status":"publish","type":"noticias","link":"https:\/\/seipasa.com\/en\/news\/seipasa-completes-the-first-phase-of-installing-solar-panels\/","title":{"rendered":"Seipasa has completed the first phase of installing solar panels at its production plant"},"content":{"rendered":"<p>Seipasa, the Spanish company specialised in the development and formulation of bioinsecticides, biofungicides and biostimulants for agriculture, has completed the first phase of <strong>installing solar panels at its production plant in L\u2019Alc\u00fadia, in Valencia.\u00a0<\/strong><\/p>\n<p>Now that these new solar panels are operative, <strong>Seipasa is 40% self-sufficient in solar energy, while the rest of the electricity used comes from renewable energy sources.\u00a0<\/strong><\/p>\n<p>Seipasa&#8217;s Quality and Environment Manager, Mar\u00eda del Puig Mora, highlighted that with this new installation, <strong>Seipasa meets its <a href=\"https:\/\/www.seipasa.com\/en\/news\/seipasa-embarks-on-the-path-of-achieving-zero-co2-emissions\/\">objective of zero CO<sub>2<\/sub> emissions from electricity consumption<\/a>.\u00a0<\/strong><\/p>\n<p>This new project is part of the <a href=\"https:\/\/www.seipasa.com\/en\/news\/seipasa-renews-its-emas-registered-status\/\">company&#8217;s ongoing sustainability strategy<\/a>. It is one more step towards the goal of <strong>reducing our dependency on conventionally produced electricity in our manufacturing processes<\/strong>. This is an initial stage in the installation which adapts to our current needs, but we certainly plan to extend it in the future&#8221;, Ms Mora stated.<\/p>\n<h2>To be the solution and not the problem<\/h2>\n<p>Seipasa&#8217;s Quality and Environment Manager reiterated the company&#8217;s commitment to actions that are geared towards reducing polluting emissions and greenhouse gases: &#8220;To combat global warming, <strong>companies should be part of the solution, not the problem. <\/strong>The future is bleak if we don&#8217;t take care of nature and our environment, and for this reason every action counts however small it may be&#8221;.<\/p>\n<p>The installation of this first phase of solar panels at Seipasa&#8217;s production plant meets the UN Sustainable Development Goals 7 and 13 regarding clean energy and actions to combat climate change. Moreover, this project is in line with the EU target of at least 40% less greenhouse gas emissions by 2030, compared to 1990.<\/p>\n<p>This photovoltaic solar energy installation project at Seipasa (IEAUTF\/2021\/48) has been co-financed by the European Union together with the Instituto Valenciano de Competitividad Empresarial (IVACE) under the program \u2018Instalaciones de Autoconsumo Empresas y Entidades 2021\u2019 (Self-consumption Installations Companies and Entities 2021) with the aim of promoting technological development, innovation and quality research.<\/p>\n<h2>Participation of the IVACE<\/h2>\n<p>This is a project supported by the <a href=\"https:\/\/www.ivace.es\/index.php\/es\/\" target=\"_blank\" rel=\"noopener\">IVACE <\/a>(Instituto Valenciano de Competitividad Empresarial) co-financed by the European Union within the FEDER Operational Program of the Valencian Community 2021-2027. (&#8216;Photovoltaic solar energy installation project in Seipasa&#8217; (IEAUTF\/2021\/48) within the program &#8216;Self-consumption installations for companies and entities 2021&#8217;).<\/p>\n<p>The project has consisted in the implementation of a new electrical installation of photovoltaic solar energy of 48kW of nominal power with discharge of surplus to the network without accumulation, in the industrial building located in C\/Ciudad Dario N\u00ba 1,3,5. P.I. La Creu, C.P.: 46250 L&#8217;Alcudia, (Valencia). A substantial improvement has been achieved in the supply of electricity from 100% renewable energy to its facilities, which represents a further gesture of the company&#8217;s commitment to sustainability and the environment. The amount received was 9,116.17 \u20ac.<\/p>\n","protected":false},"featured_media":5268,"template":"","class_list":["post-4693","noticias","type-noticias","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/seipasa.com\/en\/wp-json\/wp\/v2\/noticias\/4693","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/seipasa.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/seipasa.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/seipasa.com\/en\/wp-json\/wp\/v2\/media\/5268"}],"wp:attachment":[{"href":"https:\/\/seipasa.com\/en\/wp-json\/wp\/v2\/media?parent=4693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}